Construction 7 Professional Services Project Forecast Project Forecast : Construction & Professional Services

This page contains Professional Service and Construction projects that are currently in the planning stage. ALL information presented is tentative and subject to change.

 Upcoming Projects
PROJECT NAME PROJECT NO. SCOPE OF WORK TYPE STATUS
ARFF Station Alert Upgrades CE 60512 Provide Strobe Light Annunciation of Crash Net Alerts in ARFF Stations. IFB Working on design drawings
ARFF Stations Re-Roof CE 90002 Re-roof three ARFF stations on the airport (2, 3 & 4) IFB
Central Plant Roof Replacement CE 80051 Provide labor, materials and equipment to complete the Central Plant Roff Replacement project RFP
Concourse C Gate C50 Apron Level Hold Room Conversion CE 80100 Construction of gate C-50 arpron level hold room conversion including renovation of existing spaces at apron level into a hold room w/ two position podium & miscellaneous improvements to the staircases. Also includes canopy and connector walkway. RFP
Concrete Rehabilitation RW 17L/35R Complex 2009 CE 92001 Rehabilitate portions of runway and taxiway pavements IFB
Filing 18 Phase 4 Asbestos Remediation Project CE 71203 Contract covers the asbestos removal project of the Filing 18 Phase 4 at the Stapleton site. The project consists of the excavation, removal soil clearence of Friable and Non Friable Asbestos Containing Materials Debris in soil from the areas identified in these plans and specifications. The project consists of loading, hauling, backfilling, and compacting all excavations to 95-percent standard proctor maximum density. The project consists of loading and hauling Friable and Non Friable Asbestos Containing Materials Debris in soil to DADS. The submittal of a Closure report and receipt of a No Further Action (NFA) determination letter from the State of Colorado IFB Project on hold
Jackson Gap Lane Addition from Peņa to 78th Ave CE 80412 An Additional lane of concrete will be added on the east side of Jackson Gap from Pena Blvd. to 78th Ave. IFB
New Shuttle Parking Lot Design CE 83002 This contract will be for the design of a new shuttle parking lot. RFP In development
Pikes Peak Credit Card In/Credit Card Out Upgrades CE 80358 New credit card in-credit card out equipment will be installed at the Pikes Peak parking lot at the entrances and exits on the east and west sides of the parking lot. IFB
Renovation of N Term Sec, AOB Lobby, Conc A FIS Restrooms, Tenant AHU Upgrades & Main Term L5W Restr CE 81192 Renovation work consisting of three construction document packages 1) North Termainal Security 2) AOB Lobby 3) Concourse A, Mezzanine Levl FIS Restrooms 4) Tenant AHU Upgrades 5) Main Terminal LVL 5W Restrooms IFB
Terminal Window Security Film CE 71138 A protective window film will be places on the inside of the terminal window to keep the glass from shattering due to a blast or explosion. IFB Tentative issue July 2008
Tower Road-Ramp Replacement CE 80391 The southeast ramp from Tower Road to Pena will be removed and replaced. IFB