For photo and B-roll requests, please email [email protected]
Due to the high volume of requests, please allow two to three business days for a response.
Pikes Peak lot construction and partial West Garage closure
Due to Pikes Peak lot construction, travelers should use the Landside parking lot located at 6975 Valley Head Street. This lot will be open for overflow parking starting at 3 a.m. until full, on Wednesday, July 3. The Pikes Peak and Longs Peak shuttle parking lots will close on Wednesday, July 3 at 3 a.m. and re-open by 5 p.m. Regular shuttle service will still be available to/ from all parking lots. | Separately, Rows A-D in the West Garage will be closed July 15 through July 22 on all levels for power washing and re-striping work. Any remaining vehicles in the area will be relocated to the surface lot adjacent to the southwest corner of West Garage.
Follow DEN on Twitter Follow DEN on InstagramPopular Searches
DENVER INTERNATIONAL AIRPORT
Due to the high volume of requests, please allow two to three business days for a response.